Customer/Project


Supply details


Value (Saudi Riyals)

Al Hussaini contracting
Grundfos hydro 2000 and Patterson Fire pumps
320,000.00
Technip (Aramco pipe line)
Flowserve Durco pumps & Grundfos SP Pumps
350,000.00
Al Khiran pearl city Kuwait
Supply of Variable frequency boosters Flowserve MEN pumps equipped with Groupe schneider VFDs
265,000.00
Metito
Flowserve 65-40 CPX 315 pumps
244,973.00
Metito
4 x Flowserve 65-40 –CPX 315
237,152.00
Al Khodari pump+engine +piping
Supply of National vertical turbine
231,000.00
SCECO
Supply and installation of submersible deep well pumps
236,000.00
MODA (Air Base,Dhahran)
Supply of Deep well & sewage pumps
238,000.00
NADA
Supply and installation of IDP Boosters - split case pumps
235,000.00
Khodari & Sons
National Vertical turbine pump + 267 HP Fiat engine
227,000.00
Al Shalawi (Aramco East West pipe line)
Supply of submersible sewage pumps(Myers)
207,050.00
Najran Power plant sceco (NCC-Power plant Div)
Flowserve vertical cannister pumps
200,000.00
Rabigh material yard
Supply of Vaughan Grinder pumps and panel
200,000.00
Ozest
Grundfos NK pump with diesel engine
190,000.00